Maintenance / 2008 AP2 CR

Valve clearance inspection

Follow the engine-specific valve-clearance procedure and resealing requirements.

IntervalMinder 4; inspect/adjust earlier during A, B, 1, 2 or 3 services if noisy.Corroborated

01 / Requirements

Configuration-specific service and fitment facts

These sourced values are shared by the specification sheet and the maintenance guides for this exact configuration.

Cold valve clearance
Cylinder head below 38 °C: intake 0.21–0.25 mm; exhaust 0.25–0.29 mm. Adjustment locknut 20 N·m; recheck after tightening. Corroborated
Cover sealing and hardware
Follow Honda’s complete head-cover removal, cylinder-position sequence and refitting procedure. Clean the gasket and mating grooves; inspect spark-plug seals, cover washers and rubber seals, replacing damaged or deteriorated pieces. Tighten cover bolts in the specified sequence and three stages, finishing at 12 N·m. Conditional replacement seals and any specified resealing supplies remain purchase gaps.